Not a lot of visual difference to show but important progress nonetheless on Monday and Tuesday. I returned to the office whilst She Who Must Be Obeyed watched over our abode. Finishing sanding was completed in the kitchen, flooring was installed up the stairs and down the second floor hallway, new heat grates were placed, and the new kitchen sink arrived. A supply of pre-primed moulding was left off for me to paint – a job I will probably do Monday morning. The contractor has finished until after Thanksgiving so I’m hoping the molding will be installed next week followed promptly by arrival and installation of the Cambria countertops and (finally!) plumbing.
Because the floors are in place, Tasha was released from her bedroom exile for the first time in a week and a day. She explored the place tentatively, examining everything, pacing around and around the living room and kitchen. She appears to be uncertain of her new environment and stays close to us all of the time. In the mean time, the main floor has little furniture and the kitchen is barely useable, so we all spend most of our time in the master bedroom.